VA Patient Services
Phases 2 & 3, VA La Jolla
This project also resided in a multi-story, occupied hospital. As a result our crews worked during multiple shifts to reduce impact to patient care, where ACM was present. This was a multi-phase project that included the temporary closure of corridors, as well as tying new construction into existing spaces.
Calray Electric, Inc. provided electrical support to renovate the 1st Floor Volunteer and Patient Services Department. The scope of work included selective demolition in an active hospital environment; provided and installed new power and lighting, as well as energy efficient Exergy lighting control system, provided conduit, back boxes and coordination for all low voltage systems, including access control, fire alarm, data, nurse call, CCTV and DDC system.
This project required multiple phases, as well as off hours construction shifts to reduce impact to patient care. The surrounding areas of this project remained fully operational during construction. The area was contaminated with Asbestos through demolition. This required extra diligence in keeping our infectious control procedures in place. This work was performed at a medical facility and was a federal project. This required the additional payroll and other reporting to be provided in a timely manner to ensure compliance Federal regulations.